www.pcl.com
HomeCareersWatch Us BuildLocationsContact Us

Eagan High and Dakota Hills Middle School

Aerial View

Location:

Eagan, MN

Built By:

PCL Construction Services, Inc.
Project Description
Project was divided into six interconnected buildings ranging from one to three stories. The project included building two large and one small gymnasium, TV studio, dance studios, lecture halls, two libraries, swimming pool, diving pool, locker rooms, industrial arts shop, large auditorium and stage with all stage equipment and riggings, two full kitchens, loading dock with warehouse, large freezer storage, two acre pond for aesthestics and landscape irrigation, two regulation tracks (one with all weather surface), nine baseball fields, two softball fields, nine soccer fields, five football fields, discus shotputs, pole-vaults, long jumps, high jumps and grandstand stadium. Built with future consideration of building expansion. Curtainwall, masonry exterior wall system and EPDM roofing type.

 

Contact

For similar projects contact:

Owner

Independent School District #196

Prime Consultant