Location:
Orlando, FL
Built By:
PCL Construction Services, Inc.
|
|
 |
Project Features/Highlights
- six levels of parking
- 10,100 car capacity
- ability to accommodate 3,000 vehicles/hour
- 3,000,000 sf of 5"-thick post tensioned and concrete slabs
Project Description
Phase II of Universal's new parking structure, consists of a 6-level garage with an adjoining hub, in what will be the largest single-structure parking complex in the United States. The parking garage is connected to Phase I through the elevated hub (part of Phase I construction), which serves as a functional focal point, holding a 35,000 sf floor slab and containing more than 2,000 cubic yards of concrete, produced over a continuous pour of more than 8 hours.
|