 |
 |
 |
Location:
Ferndale, WA
Built By:
PCL Construction Services, Inc.
|
|
 |
Project Description
The Refinery Operations Center will serve as an efficient, twenty-four hour facility for ConocoPhillips' refinery operation in Ferndale, Washington. The project will be a precast, tilt-up, concrete structural system, housing slightly less than 15,000 square feet of interior space. The reinforced, concrete roof will be held up by a structural steel grid. Due to the nature of the site and its surroundings, many surfaces will be blast resistant. The large, central control room will feature a computer access floor while the remainder of the structure will house offices for both shifts and basic living amenities including a kitchen, lockers, and an exercise room. Site work and landscaping will also be completed. This project will be carried out quickly with groundbreaking in July and substantial completion in December. A large lab area is also in planning for addition onto the east side of the building.
|
Contact
For similar projects contact:
Owner
Prime Consultant
|
 |