 |
 |
 |
Location:
Denver, CO
Built By:
PCL Construction Services, Inc.
|
|
 |
Project Description
This project consisted of building out the General Reference Room of the Denver Public Library in preparation for the Denver Summit of the Eight (G7 Summit). Phase I of this project consisted of constructing two separate platforms for Interpreter Booths, modifications to existing tables for each Serpia to use during the conference, installation of a double flooring for cable, telephone and fax machines, carved carpet and fabric border over the flooring, and installation of specialized lighting for the meeting. Phase II of this project consisted of the removal of all installed items and restoration of the Summit meeting room to prior conference conditions.
|
Contact
For similar projects contact:
Owner
Prime Consultant
|
 |