|
|
|
|
|||||||||||||||||||||||
Project Description
This project entailed alterations/upgrades to the existing site drainage and sewer system as well as installation of subsurface infrastructure for future electrical, communications, water and sewer systems. Work included, demolition of approximately 6,000 sf of existing concrete and asphalt surfacing material, excavation and installation of two trench drains and potable water supply/drain lines, excavation and installation of a subsurface transformer vault and associated electrical feed conduit, grading and asphalt resurfacing of the project area.
|
Contact
Contact ProjectPhone: (206) 233-2508
Fax: (425) 454-5924
OwnerWoodland Park Zoological Society
Prime ConsultantDomoto Architects
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |