The Ted Stevens Anchorage International Airport "South Terminal Seismic & Security Retrofit Phase 2" consists of the remodel and retrofit of the B Concourse and the remaining portions of the Main Terminal. The scope of work includes abatement of hazardous materials and demolition of portions of the existing structure, seismic upgrades, interior and exterior architectural finishes, roofing, and mechanical and electrical system upgrades. The new upgrades are designed to bring the terminal and systems up to code, and to revise the architectural aspects to more closely match the newly constructed C Concourse.