|
|
|
|
|||||||||||||||||||||||
Project Description
New hospital consisting of five (5) stories above grade and basement. Project is designed to allow for two (2) additional stories. A two (2) story centrally located public lobby and proposed garage connection. A new structured ramp provides a covered area for 6-8 ambulances to access the Emergency Department at level one (1). Demolition of the remaining portions of the existing hospital's front entrance to allow construction of a corridor at level one (1). The existing ED will remain functional until the new ED can be opened up one level one (1) in Fall 2006. The existing ED will then be demolished and the basement portion between the two (2) buildings will be excavated.
|
Contact
Contact ProjectPhone: (719) 473-7201
Fax: (719) 473-7764
OwnerPrime ConsultantJonathan Bailey Design, LLC.
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |