 |
Active Projects
 |
Consolidated Car Rental Facility
Location: |
Las Vegas, NV |
Description: |
Airport car rental facility for all local agencies |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
 |
UCI Student Center Expansion Phase 4
Location: |
Irvine, CA |
Description: |
Student Center Administration Building |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Design-Build [DB] |
|
 |
Centre Street Lofts
Location: |
San Pedro, CA |
Description: |
Five-Story Mixed-Use Development |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
 |
The Market @ Ninth and Flower
Location: |
Los Angeles, CA |
Description: |
Mixed-use Complex in Downtown Los Angeles |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
 |
CSU Channel Islands John Spoor Broome Library
Location: |
Camarillo, CA |
Description: |
New campus library will serve as the focal point. |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Design-Build [DB] |
|
 |
LAUSD Central Los Angeles High School #9
Location: |
Los Angeles, CA |
Description: |
Seven Buildings Totaling 238,000-square-feet on Ten Acres |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
 |
Fox Studios Parking Structure
Location: |
Los Angeles, CA |
Description: |
789-stall Parking Structure: Five Levels Below Grade and Four Levels Above Grade |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
 |
Olympic West Parking Garage
Location: |
Los Angeles, CA |
Description: |
Construction of 1,050,806 SF parking structure for LA Live. |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
 |
Kaiser Ontario Vineyard Parking Structure
Location: |
Ontario, CA |
Description: |
1520 Car Cast-in-place Parking Structure |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Design-Build [DB] |
|
 |
UCI Food Court Tenant Spaces #1 to 7
Location: |
Irvine, CA |
Description: |
|
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
Contacts
PCL Construction Services, Inc.
700 N. Central Avenue, Suite 700 Glendale CA 91203
Phone: (818) 246-3481
Wil Painter
|
 |